04 · $0.35 / sq ft · $0.75+ / lin ft
Sealcoat, crack fill, mastic & patch
The maintenance work that actually matters, in order of what you need. Sealcoat every 2–3 years to slow UV and water damage. Crack-fill small cracks early — a $0.75 crack becomes a $650 pothole fast. For wider cracks, failing joints, and alligator-cracked patches that regular sealant won't hold, we use hot-applied mastic — a heavier aggregate-loaded material that bridges the gap between crack fill and full patching. Spot patching handles the ones that got away.
- Sealcoat cycle
- Every 2–3 years
- Crack fill
- Cracks 1/8" – 1" wide
- Mastic
- Wide cracks, joints, alligator patches
- Patching
- Potholes, structural failures
- Cure
- Typically 24 hours off-limits